Singing Dog Farm
  • The farm
  • Blog
  • Cottage Information
  • The Guardians
  • Friesians
  • Pilot page

Master bath

6/14/2014

10 Comments

 
The master bath is, happily, done. It was a process to figure out, on the fly, how to build a walk in shower. Minus the internet and it would have been constructed with black plastic, unrolled and duct taped to the studs. Add the miracles of the millennium and a little mind meld between me and some people who actually know what they are doing and shazaam, a shower. Not perfect, not horrible, without significant blood loss or requiring large quantities of alcohol to recover from (though I am thinking about those bottles upstairs  above the quarter bath). Floor heat is in, but not on yet (waiting. 28 days after installation. No idea why besides the mortar bag said to). The toilet flushes and presumably, appropriately, sends it's contents to the septic system. I haven't actually verified that empirically. My conclusion is more by inference and, like the light bulb in the refrigerator and our acceptance that it does turn off when the door is closed, taken a little bit on faith. I flush, nothing horrible runs out on the floor, things must be good.
Picture
The vanity we, with our weird and unsuccessful planning, special ordered in about '07. It's very nice to see it used. There was only token resistance from the spiders who had been happy for the loan of the real estate in the interim.
Picture
Picture
Looking up in the shower to the skylight. This is where the stairs used to be. That seems odd.
10 Comments

    Archives

    April 2016
    December 2014
    October 2014
    June 2014
    April 2014

    Categories

    All

    RSS Feed

Thanks for checking out our site!

 Chris and Teri

360-333-1240 or [email protected]

360-391-1032 or [email protected]

Web Hosting by iPage